Demand calculation
From Projects
Revision as of 12:01, 23 October 2024 by WikiSysop (Talk | contribs) (Created page with "A simple demand calculation leveraged across the industry to generate an approximate base FTE required is as follows: Base FTE Required = Call Volume Offered X Average Handle...")
A simple demand calculation leveraged across the industry to generate an approximate base FTE required is as follows:
Base FTE Required = Call Volume Offered X Average Handle Time / 3600 / Total Annual Work Hours / Occupancy / (1 - Shrinkage)
This calculation can be leveraged to establish a base FTE needed to service an annual workload in order to begin calculating the true costs associated with employee attrition, as described in the High Cost of Attrition