Demand calculation

From Projects
Jump to: navigation, search

A simple demand calculation leveraged across the industry to generate an approximate base FTE required is as follows:

Base FTE Required = Call Volume Offered X Average Handle Time / 3600 / Total Annual Work Hours / Occupancy / (1 - Shrinkage)

This calculation can be leveraged to establish a base FTE needed to service an annual workload in order to begin calculating the true costs associated with employee attrition, as described in the High Cost of Attrition