Revision history of "Demand calculation"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 12:01, 23 October 2024WikiSysop (Talk | contribs). . (532 bytes) (+532). . (Created page with "A simple demand calculation leveraged across the industry to generate an approximate base FTE required is as follows: Base FTE Required = Call Volume Offered X Average Handle...")